![Gatehouse Getaway beach signature](https://gatehousegetaway.com/wp-content/uploads/2020/01/Gatehouse-Getaway-beach-signature-520x400.jpg)
Celebrating six months on the road travelling Europe π
Our first dividing wall is going in – one wall of the toilet, next to the end of the bed.We need to keep weight asRead More
An early task on the van was to get a floor installed – the main floor of the van is ridged metal – not veryRead More